Bathroom Renovation Mistakes Sydney Homeowners Make (And How to Avoid Them)

A comprehensive guide to the most common bathroom renovation mistakes in Sydney, covering budgeting, planning, builder selection, layout, and where to save or splurge.

By
Cameron Gerardis
January 21, 2026
•
9 mins
Custom timber bathroom vanity with LED backlit mirror cabinet and wall-mounted chrome tapware

Bathroom Renovations

Smart, space-efficient bathroom renovations for Sydney homes. We take care of layout, waterproofing, tiling, and fixtures - with expert planning, clear pricing, and full project management from start to finish.

šŸ‘‰ Explore our Bathroom Renovation services

Bathroom Renovation Mistakes Sydney Homeowners Make (And How to Avoid Them)

Bathroom renovations are a significant investment, and knowing what to expect upfront makes the whole process smoother. Whether you're updating an ensuite in Mosman or renovating a main bathroom in Neutral Bay, the same pitfalls tend to come up.

This guide covers the common mistakes we see in Sydney bathroom renovations, what they typically cost, and how to avoid them. The goal is to help you ask the right questions and make informed decisions, whether you're just starting to research or already talking to builders.

What Are Common Bathroom Renovation Mistakes?

The most common mistakes fall into three categories: budget miscalculation, poor planning, and cutting costs in the wrong places. In Sydney, where a quality bathroom renovation runs $35,000 to $60,000, these mistakes aren't just inconvenient. They're expensive.

Here's what to watch for.

Mistake 1: Not Setting a Realistic Budget

The problem: Coming in with a $15,000 budget for a full bathroom renovation when the actual cost is more like $30,000.

We understand the sticker shock. Bathroom renovations cost more than most people expect. But underestimating doesn't make it cheaper. It just means you'll either compromise on quality halfway through or blow your budget completely.

What it costs in Sydney (2026):

  • True cosmetic refresh (paint, tapware, accessories only): $2,000 to $8,000
  • Full renovation, same layout: $30,000 to $45,000
  • Full renovation with layout changes: $40,000 to $60,000
  • High-end or complex bathroom: $60,000 to $95,000+

These aren't inflated numbers. They reflect what quality work actually costs when done properly.

Important note about "cosmetic updates"

Many homeowners assume they can just "change a few things" like tiles or the shower to save money. This isn't how bathroom renovations work.

Once you remove tiles, the waterproofing membrane underneath is compromised. At that point, NSW building codes require full waterproofing replacement before new tiles go down. There's no partial fix.

What actually qualifies as a cosmetic update (that doesn't trigger full renovation):

  • Painting walls or ceilings
  • Replacing tapware (if surface-mounted, not in-wall)
  • New mirror or vanity cabinet
  • New toilet seat
  • Accessories (towel rails, toilet roll holder, robe hooks)

What requires full renovation:

  • Replacing tiles (floor or wall)
  • Changing shower layout or fixtures
  • Moving plumbing fixtures
  • Fixing leaks or water damage

Your builder should explain this clearly during quoting. If someone offers to "just retile" without mentioning waterproofing, that's a red flag.

What people forget to budget for:

  • Waterproofing compliance: $3,000 to $5,000
  • Plumbing relocation if you change the layout: $2,000 to $8,000
  • Electrical upgrades for heating, lighting, exhaust fans: $1,500 to $3,000
  • Structural work if you're opening up walls: $3,000 to $10,000
  • Contingency for unexpected issues, especially in older North Shore homes: 10% to 15% of total budget

Questions to ask when setting your budget

Start with the outcome you want, not an arbitrary number. If you want a genuinely beautiful, functional bathroom that will last 15 to 20 years, the investment needs to reflect that. Look for builders who break down exactly what's included in their quotes. If one quote comes in significantly cheaper than others, ask what's been excluded or where quality has been reduced.

At LikeSilk Building, we walk you through the full cost breakdown before you commit to anything. No surprises. No "that'll be extra" halfway through.

Mistake 2: Skipping the Planning Phase

The problem: Rushing into demolition before key design decisions have been made.

The excitement to start is understandable. You've been thinking about this for months. You're ready to see progress. But demo is easy. Planning is where projects succeed or fail.

What proper planning looks like

Before any walls come down, your builder should have confirmed with you:

  • Exact layout (where everything goes)
  • Tile selections (floor, walls, shower)
  • Fixtures (vanity, toilet, taps, shower head)
  • Lighting plan (downlights, wall sconces, mirror lighting)
  • Electrical requirements (heated towel rail, underfloor heating)
  • Ventilation solution (exhaust fan placement and power)
  • Waterproofing approach

If these decisions are being made during construction, the project is already behind. Trades are waiting. Lead times blow out. Costs increase.

Timeline expectations

Good planning takes 2 to 4 weeks. Construction takes 3 to 4 weeks. The planning phase isn't wasted time. It's what makes the construction phase smooth.

Projects without proper planning often extend to 10 weeks instead of 4 because selections aren't ready when trades arrive.

Mistake 3: Choosing the Wrong Builder

The problem: Hiring someone who isn't qualified to handle the technical requirements of bathroom renovations.

Bathrooms aren't cosmetic projects. They're technical. Waterproofing, plumbing compliance, electrical safety, ventilation. When these aren't done correctly, the result is water damage, mould, or worse.

NSW waterproofing compliance

In New South Wales, waterproofing must comply with Australian Standard AS 3740. It must be done by licensed professionals. It must be inspected before tiling. There's no shortcut here.

Failed waterproofing is one of the most expensive mistakes you can make. Cost to fix: $15,000 to $25,000. Cost to do it right the first time: included in a proper quote.

What to look for when evaluating builders

Price is important, but it shouldn't be the only factor. Look for:

  • Current builder's licence (check NSW Fair Trading website)
  • Insurance (public liability and contract works)
  • Detailed quotes that break down scope and inclusions
  • References from recent bathroom projects
  • Clear communication from the first conversation
  • Systems and processes (how they manage timelines, selections, communication)

One particularly revealing question: "What happens if we discover unexpected issues during demo?"

A professional builder has clear processes for handling surprises. Someone less experienced will be vague about it.

Questions to ask before you sign

  1. Who will be on site every day?
  2. How do you handle changes or variations?
  3. What's your process for waterproofing sign-off?
  4. How do you communicate progress?
  5. What happens if you discover asbestos or structural issues?

If they can't answer these clearly, keep looking.

For more guidance, read our article on 10 Questions to Ask Your Builder Before You Sign.

What Is the Hardest Part of Renovating a Bathroom?

Honestly? Living through it.

The actual construction isn't the hard part. That's what your builder handles. The hard part is the disruption. No shower for 3 to 4 weeks. Dust (even with the best containment). Noise. Strangers in your home every day.

What helps make it manageable

  • Plan alternative shower arrangements ahead of time (ensuite, kids' bathroom, gym membership)
  • Set clear expectations with your household before work begins
  • Choose a builder who maintains clean, respectful work sites
  • Remember the end goal. It's temporary disruption for a permanent improvement.

Most of our clients on the North Shore are working professionals with families. They don't have bandwidth for chaos. That's why we're obsessive about organisation, communication, and keeping the site as clean as possible. The build is temporary. The outcome is permanent.

Learn more about realistic timeframes in our guide: How Long Does a Bathroom Renovation Take in Sydney?

Mistake 4: Ignoring Layout and Flow

The problem: Keeping the same layout "to save money" when the layout is actually the problem.

Sometimes the existing layout works. Often it doesn't. A poorly planned layout is something you'll regret every single day.

What is the golden rule for bathroom layouts?

Functionality first, aesthetics second. Specifically:

  1. Toilet placement: Minimum 900mm of space in front. At least 200mm clearance from walls or other fixtures on each side.
  2. Door swing: Should never hit the toilet or vanity. Consider pocket doors or outward-opening doors for tight spaces.
  3. Shower size: 900mm x 900mm is the minimum. 1000mm x 1200mm or larger is significantly more comfortable.
  4. Traffic flow: Clear path from door to shower without bumping into things.

Common layout mistakes in small bathrooms

  • Shower door that hits the toilet when open
  • Vanity so close to the toilet you can't comfortably sit
  • Mirror positioned where you can't actually use it
  • Towel rail on the opposite side of the room from the shower

These seem small. They're not. You use your bathroom twice a day, every day. Bad layout becomes a daily frustration.

Layout considerations for ensuites vs main bathrooms

Ensuites serve 1 to 2 people and can be optimised for efficiency. Main bathrooms serve the whole household. Prioritise storage, double sinks if space allows, and separation between toilet and shower zones if possible.

In older North Shore homes, we often see tiny ensuites (2m x 2m) that can be dramatically improved just by relocating the door or reconfiguring the layout. Sometimes spending $3,000 on layout changes adds $20,000 in perceived value.

Mistake 5: Cutting Costs in the Wrong Places

The problem: Saving $1,500 on waterproofing to spend $3,000 on designer tiles.

We get it. Budgets are real. But where you save matters enormously.

Where NOT to save

  • Waterproofing: This is non-negotiable. Cut costs here and you're gambling with structural damage and mould.
  • Plumbing and drainage: Cheap plumbing fails. Then you're cutting into walls to fix it.
  • Ventilation: Poor ventilation means moisture buildup means mould. Don't skip the exhaust fan or cheap out on capacity.
  • Shower screen: A flimsy screen looks cheap and often leaks. Spend the extra $500 for quality.

Where you CAN save without regrets

  • Tiles: Expensive tiles look great, but mid-range tiles installed beautifully look just as good. Save $2,000 to $5,000 here.
  • Vanity: IKEA or Bunnings vanities are actually decent quality if you choose carefully. Save $1,000 to $2,000.
  • Accessories: Towel rails, toilet roll holders, robe hooks. These don't need to be high-end. Save $500.
  • Mirror: A basic mirror in a nice frame beats an expensive mirror every time. Save $300 to $800.

Smart ways to reduce costs without sacrificing quality

  1. Keep the existing layout (saves $3,000 to $8,000 in plumbing relocation)
  2. Choose standard sizes for shower screens (custom costs 30% to 50% more)
  3. Use feature tiles as accents, not full-wall coverage
  4. Stick with your builder's preferred suppliers (they get trade pricing)

We're always honest about where you can save and where you shouldn't. Our job isn't to upsell. It's to help you get the best outcome for your budget.

For a full cost breakdown, check out our Sydney Bathroom Renovation Cost Guide.

Mistake 6: Not Planning for Ventilation and Lighting

The problem: Treating ventilation and lighting as afterthoughts instead of critical design elements.

Ventilation

Sydney's humidity means bathrooms without proper ventilation develop mould. Fast. Especially in coastal areas like Mosman and Cremorne.

Your builder should specify an exhaust fan that:

  • Has adequate capacity for the room size (minimum 150mm diameter for standard bathrooms)
  • Vents to outside (not into the ceiling cavity)
  • Runs automatically (sensor or timer switch)

Proper ventilation costs $600 to $1,200 installed. Mould remediation costs $3,000 to $10,000+.

Lighting

Most bathrooms are either too dim (one sad downlight) or too harsh (bright white LEDs that make you look ill).

What good bathroom lighting looks like:

  • Overhead lighting: LED downlights (3000K warm white, not 5000K clinical)
  • Task lighting: Wall sconces or backlit mirrors at face height
  • Accent lighting: Under-vanity LED strips or niche lighting (optional but beautiful)

A good electrician will calculate lighting needs (aim for 300 to 400 lux overall brightness with dedicated task lighting around the mirror). Without professional guidance, most bathrooms end up under-lit.

Mistake 7: Underestimating the Timeline

The problem: Thinking your bathroom will be done in 2 weeks because someone on a renovation show did it.

Realistic timeframes for Sydney bathroom renovations

  • Planning and selections: 2 to 4 weeks
  • Demolition: 1 to 2 days
  • Plumbing rough-in: 2 to 3 days
  • Waterproofing (including cure time): 3 to 5 days
  • Tiling: 4 to 6 days
  • Fixtures and finishing: 3 to 5 days
  • Total construction time: 3 to 4 weeks for a standard bathroom

Ensuites can be slightly faster (2 to 3 weeks). Large main bathrooms or complex projects can take 5 to 6 weeks.

What causes delays

  • Waiting for tiles or fixtures that weren't ordered early enough (add 2 to 4 weeks)
  • Discovering asbestos that needs removal (add 1 to 2 weeks)
  • Structural issues found during demo (add 1 to 3 weeks depending on severity)
  • Waterproofing failing inspection (add 1 week minimum)
  • Client indecision on selections (add however long it takes to decide)

The best way to avoid delays? Work with your builder to finalise selections before construction starts, and choose someone with proper project management systems.

In What Order Should I Renovate a Bathroom?

Here's the correct sequence:

  1. Engage your builder early: Before finalising designs or selections. A good builder helps you plan realistically from the start.
  2. Planning and design together: Work with your builder to finalise layout, selections, and budget. They'll flag what's feasible, what affects cost, and what has long lead times.
  3. Order long-lead items: Tiles, vanity, shower screen (anything with 4+ week lead times). Your builder should manage this timeline.
  4. Demolition: Strip everything back to studs and subfloor
  5. Rough-in: New plumbing, electrical, blocking for fixtures
  6. Waterproofing: Membrane application and inspection
  7. Tiling: Floor first, then walls, then shower
  8. Cabinetry installation: Vanity goes in
  9. Fixtures and fittings: Toilet, taps, shower screen, accessories
  10. Final finishes: Painting, caulking, cleaning
  11. Final inspection and handover

Skip steps or do them out of order and expensive problems follow. Tiling before waterproofing is inspected, for example, means ripping everything out if the inspection fails. That's an $8,000 mistake a good builder will never make.

Key Takeaways: How to Avoid Bathroom Renovation Mistakes

Let's summarise what matters:

Budget realistically: $30,000 to $60,000 for a quality full renovation in Sydney. Include 10% to 15% contingency.

Plan before you demo: Lock in layout, selections, and approvals before construction starts.

Hire the right builder: Licensed, insured, experienced in bathrooms, great communication. Not the cheapest quote.

Get the layout right: Functionality beats aesthetics. Don't compromise on clearances and flow.

Don't cut corners on waterproofing, plumbing, or ventilation: These aren't negotiable. They're the foundation.

Expect 3 to 4 weeks construction time: Plus 2 to 4 weeks planning. Plan your life around it.

Make decisions early: The biggest delays come from client indecision, not construction issues.

Ready to Renovate Your Bathroom the Right Way?

At LikeSilk Building, we guide you through every decision, lock in your budget and timeline upfront, and keep you informed every step of the way.

Whether you're renovating an ensuite in Mosman or a family bathroom in Lane Cove, we make it smooth.

Book a free planning call. We'll walk through your project, give you honest advice about what's possible, and help you avoid the expensive mistakes before they happen.

No pressure. No obligation. Just clarity.

Book Your Free Planning Call

ā€

Disclaimer: The content in our blogs are for informational purposes only and do not constitute legal advice. Always consult a qualified professional for guidance tailored to your specific situation.
Get a no-obligation consultation

Not sure where to start? Let's have a chat

Thinking about renovating? Even if you're not entirely sure of the scope of your project yet, get in touch with us below with a few details and our licenced builder Cam will reach out to help your get started.

You're in good hands.
We've received your enquiry and Cameron will reach out within 24 hours to learn more about what you're planning.
Hmm, that didn't work. Technology, right?
Give it another go, or just call Cameron on 02 8530 0901 - he'd love to hear from you.