Kitchen and Bathroom Renovation in Toongabbie

Interior 8 weeks $65K – $85K
Location Toongabbie
Project type Interior
Duration 8 weeks
Price range $65K – $85K
Completed June 2026
Overview

About this project

A full kitchen and bathroom renovation in Toongabbie, completed in eight weeks. New joinery, stone benchtops, a walk-in shower and a smarter floor plan.

A project like this typically ranges from

$65,000
$85,000

Scope of work

  • Full kitchen renovation with new joinery throughout
  • Kitchen reconfigured: doorway to hallway closed, opening to sunroom closed, dining wall extended to suit the new layout
  • Breakfast bar with stone benchtop and floating timber shelves above
  • Tall pantry, integrated fridge cabinet and bi-fold appliance cabinet
  • Stone benchtops and splashback
  • Full bathroom renovation
  • Bathroom reframed with walls straightened and a new cavity sliding door
  • Walk-in shower with bench seat, niche and linear drain
  • Fluted vanity with stone top and wall-mounted tapware
  • Floor-to-ceiling tiling to bathroom
  • New flooring through kitchen, hallway and living areas
  • Demolition and strip-out

The renovation story

A bigger kitchen without a bigger footprint

The kitchen in this Toongabbie home had a doorway through to the hallway and an open link through to the sunroom. Between them, they left very little uninterrupted wall to work with, and the kitchen that resulted was smaller than the room could actually support.

Rather than extend, we closed both openings and extended the dining wall slightly. That gave back two full runs of wall, and the new layout follows them: a sink run with a dishwasher and floating timber shelves above, an oven run with two sets of drawers, and a fridge run carrying a tall pantry, an integrated fridge cabinet and a bi-fold appliance cupboard. A breakfast bar with a microwave opening and an integrated twin bin closes off the fourth side.

The joinery is white matt laminate on a moisture-resistant carcass, with soft-close hinges and drawers throughout and stone benchtops carried up as the splashback.

A bathroom taken back to the frame

The bathroom was stripped to the frame so the walls could be straightened and reframed before any waterproofing or tiling started. That is unglamorous work that never shows up in a photo, but it is the difference between tiles that line up and tiles that do not.

The swing door was replaced with a cavity slider, which returned the floor area the door had been sweeping through. The shower was rebuilt as a walk-in with a full-width tiled bench seat, a recessed niche, and a linear drain set into the floor. Large-format tiles run floor to ceiling, with a fluted vanity and gunmetal ABI tapware.

The result

Eight weeks from demolition to handover, with both wet areas running in parallel and new flooring carried through the kitchen, hallway and living areas to tie it all together.

Thinking about a similar renovation?

See how we work
Watch the walkthrough

See the finished result

Take a walkthrough of the completed renovation. This video was filmed after handover and shows every room and finish in the project.

The transformation

Before and after

Kitchen

The kitchen was stripped back to brick and framing. Closing the doorway through to the hallway and the opening through to the sunroom freed up two full walls, which is what made the larger U-shaped layout and the breakfast bar possible. The dining wall was extended slightly to suit.

Toongabbie kitchen and living area stripped back before renovation Before
Completed kitchen with white joinery, stone benchtops and breakfast bar After

Bathroom

The bathroom was taken back to the frame so the walls could be straightened and reframed before tiling. A cavity sliding door replaced the swing door to free up floor space, and the shower was rebuilt as a walk-in with a bench seat and a linear drain.

Original Toongabbie bathroom stripped back to framing and plasterboard Before
New bathroom with fluted vanity, walk-in shower and floor-to-ceiling tiling After

Hallway

New flooring was run through the hallway, kitchen and living areas to tie the renovated rooms back into the rest of the house.

Toongabbie hallway before renovation with bare original floorboards Before
Toongabbie hallway after renovation with new timber-look flooring After

Planning a renovation?

Client review

What our client said

FAQs

Common questions about this project

Answers to the most common questions about this renovation, including costs, timelines, and materials.

How much did this Toongabbie renovation cost?

The project cost was in the range of $65,000 to $85,000. That covered the full kitchen renovation including all joinery and stone, the full bathroom renovation, the framing changes to both rooms, new flooring through the kitchen, hallway and living areas, and demolition. The range reflects selections made during the design phase for tiles, tapware, appliances and stone. For a breakdown of how these costs are put together, see our kitchen cost guide and bathroom cost guide.

How long did the renovation take?

Eight weeks from demolition through to handover, with the kitchen and bathroom running alongside each other rather than one after the other. Running wet areas in parallel shortens the overall program but means the house is harder to live in while the work is on. For more detail on how bathroom timelines work week by week, see our bathroom renovation timeline.

Why close off doorways instead of opening the space up?

Open plan is not always the right answer. This kitchen had a doorway through to the hallway and an opening through to the sunroom, and between them they broke up almost every wall in the room. Closing both gave back two continuous runs of bench and cabinetry, which is where the tall pantry, the integrated fridge cabinet and the appliance cupboard ended up. The room works harder now than it did when it had more openings in it.

Who worked on this project?

Kitchen joinery was by StyleUp Kitchens, electrical by GNM Electrical, and plumbing by Siddons Plumbing. Tiles were supplied by National Tiles and tapware is ABI. We work with the same core group of trades across our projects, which is a large part of how we keep the program tight and the finish consistent.